Slide the splices on as far as they ll go.
How to install gutter heaters.
Then trim the first section of the gutter to length with tin snips.
Use a square and pencil to mark the gutter length and cut to the line.
Route the cable from the electrical outlet to the starting point on the roof.
Begin by installing a slip joint splice on each end of an inside corner fitting.
Secure the cable to the shingle with one of the provided cable clips.
Here are the basic steps for installing new heat cable along a roof eave and gutter.
Project step by step 20 cutting the gutter.
Clip the starting point of the cable to a.
Installing gutter heat tape is meant for the prevention of the ice dams not for getting rid of them once already formed.
Snap the sections together.
This product is also not meant for clearing the roof of ice or snow but merely for creating a clear pathway for already melted snow and ice to drain to the ground.