Use caution to avoid damage to the radiant barrier foil surface.
How to install radiant barrier roof sheathing.
When installing radiant barrier roof sheathing ensure that the manufacturer s instructions are followed carefully.
When installing any structural roof sheathing you are required to ensure the sheathing is spaced a minimum of 1 8 at all joints to allow for expansion and contraction due to changes in moisture conditions.
Installation methods include radiant barrier draped over the rafters applied directly to the roof sheathing stapling to the bottom of the rafters and even laying radiant barrier on top of the attic floor insulation.
How radiant barrier sheathing works.
Working your way down towards the bottom of the roof install a second row overlapping the first row by two 2 inches.
Oriented strand board osb with a thin layer of low emitting aluminum foil attached to one side is a common type of thermal radiant barrier sheathing.
Roof sheathing installation place the skid resistant side up with the apa trademark stamp facing down and wear skid resistant shoes when installing the roof sheathing.
Continue the instructions until.
As radiant barrier sheathing is only one component of the roof and attic space you mightconsider also.
Use caution to avoid damage to the radiant barrier foil surface.
Upgrading the insulation to a higher r value insulating the ductwork installinga cool roof sealing any of the penetrations in the ceiling as well as.
Foil backed osb is applied mostly in attics.
Check out these thermostat radiant barrier installation instructions.
In an open framed attic it is generally easiest to install the strips of radiant barrier roof material across the attic perpendicular to the direction of the roof joists overlapping each run by about 2 inches.
Installing radiant barrier roof sheathing.
Install with the long dimension or strength axis of the panel across supports and with the panel.
However it is also used in wall systems.
Unroll the radiant barrier hold in place and staple to bottom of roof joists.
Roof sheathing installation place the skid resistant side up with the apa trademark stamp facing down and wear skid resistant shoes when installing the roof sheathing.
Staples should be placed 14 to 18 inches apart.