This support fitting is designed with raingo seals and fitting marks that indicate the correct placing of the gutter to give required expansion allowance.
How to install raingo gutter guard.
Use a plastic slip joint at the end of every 10 foot length connecting the gutter sections for each section with connectors.
Clip the lip and slide the backside under the gutter.
Mark a straight line on the fascia about 3 4 inch below the shingles for a guide to keep the gutter system level.
Fasten a drop outlet to the fascia every 20 to 30 feet at the desired locations of the downspouts.
Install the gutter system using ordinary household tools.
Riley the roofer says these gutter guards are the best solution i have found during my 30 years in business.
Afterward insert a 1 inch 2 5 cm 8 32 stainless steel machine screw through the hole and cap it with a flanged nut to secure the gutter to the bracket.
Continue down the length of the gutter in the same manner.
Starting at one end of the gutter clip the screen lip to the front of the gutter then slide the backside under the shingles.
Use an electric drill to create a 3 16 inch 0 48 cm diameter hole into the front side of the gutter.
Through the screw mounting hole in each bracket drill a 3 16 inch diameter hole in the front edge of the gutter.
As needed overlap gutter screen sections by at least 1 2 of an inch.
Easy to install and inexpensive so take my advic.
First install the gutter sections into the outlets using the hangers to support the individual sections.
Secure the gutter to the bracket with a 1 inch long 8 32 stainless steel machine screw and flanged nut.
Secure the gutters to the fascia brackets using machine screws.
Add an end cap to areas that won t have outlets to keep the water flowing toward the downspouts.