Install 10 x 1 vertical siding boards from top of water board drip flashing to top of wall spaced 1 apart.
How to install reverse board and batten siding.
If your sheathing is not solid plywood or osb these strips are needed to provide a nailing surface.
Use a 2 inch wide scrap board as a spacer once you have determined your layout.
When you install plywood board and batten or in my case reverse board and batten siding how do you seal the vertically running seam of two sheets.
For a reverse board and batten cladding the thin battens are nailed onto the wall first.
Nail the wide boards over the plywood to create the look of reverse board and batten.
Attach strips around windows and doors then lay out and attach horizontal strips every 16 inches.
Install 3 x 1 border trim at top of siding.
Install drip flashing on top edge of skirt board.
Space the wide boards so no seam will become visible between plywood sheets.
In some areas it is common to attach vertical 1x2 furring strips before installing board and batten siding.
Measure mark and check the spacing before attaching the first board.
The method creates an ample space between the siding and the weather resistive barrier for enhanced drying ability a significant concern in this deep superinsulated wall assembly.
Nail the strips to framing members.
The wider boards are nailed over them so the battens are behind the gaps.
Traditionally board and batten siding starts with wide vertical planks boards which are then joined together by thin vertical strips battens to cover the seams.
Install 10 x 1 water table skirt board at base of wall.