If it doesn t pull the drip edge out slightly from under the shingles.
How to install roof drip edge.
Learn more about drip edge at.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Select enough lengths of.
4 deep nail the drip edge to the sheathing every 16.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Build the lower rim of roof extended away from the fascia.
The common practice of installing drip edge tightly to the fascia creates a path for water to cling to the fascia and run down it wearing the face of the fascia and shortening its lifespan.
It can be done.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Install the drip edge by fitting it on the roof eave pushing it tightly against the edge of the plywood and.
How to install drip edge flashing on a roof step 1.
The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge.
Slide the corner tight to the fascia.
Make sure to support the long end of the cut if you let it fall after cutting it will bend down and kink the drip edge.
Gaf mastering the roof chapter 05 the drip edge is critical to provide a finished look and to add waterproofing.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
Once free slide the drip edge out and discard.
The extension should be at least inch for it to work.
How to install drip edge flashing to a new roof.
Insert the wide flank of drip cap underneath the first course of shingle or tile all the way through.
Measure the length of the eave you need to cover with drip edge using a tape measure.
Install roof drip edge along the eaves add underlayment then place drip edge along the gable end.
Place a nail at one end then the other.
Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
How to install a drip edge.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Make sure the outer edge extends over the gutter.
Secure the drip edge with roofing cement.
Install sheet metal drip cap over the lower rim.
You may need to nail through the starter strip into the drip edge.