Starting at one end attach the first fiberglass panel to the purlin with the roofing screws.
How to install speed deck roofing.
Centers supported by a beam and a ledger as on most decks.
The washer under the screw head should seal to the surface of the panel without bulging or shifting.
Place the screws in every other valley.
The project illustrated here was a complete teardown and rebuild so i framed the roof with 2x8s spaced on 16 in.
Secure the screws but do not overtighten.
Connect each unit to the next by removing and then joining with the link piece.
Roof is flush w top of exterior wall so pvc is wrapped.
As a result most decks have inadequate footings to support a.
Hospital construction 11 024 views.
Install on the deck above the metal speed deck ultra clips within 50mm.
Install the roofing screws vertically along each rib in the panel.
Then run joists connecting the front of your roof with the rear every two feet along the length of your roof.
In the 45 years since inception speeddeck secret fix roofing has become a worldwide proven system that offers fast simple installation with excellent performance and design flexibility.
Place the first screw about 7 inches from the bottom and each subsequent screw about 18 to 24 inches apart along the vertical run.
Overlap the next panel onto the one you just installed and attach it the same way this will make waterproof deck systems.
Whenever i install decking over a roof i make sure the framing is structurally sound and properly pitched to drain water.
Structural sloped steel roof system with 3 spaced drains w overflow down the middle 50 center on 3 iso board which was mech fastened to the metal roof deck.
5 day variable speed time lapse with a few closeups duration.
Installing a porch roof over an existing deck is usually not recommended unless the deck was originally designed to support a future porch.
Ensure that every decking rib has an independent plastic connector fitted cut the foam to obtain a start or final portion from a full unit if needed ensuring the foam slot coincides with the upper sheet underlap.
We built a new warehouse in 2005 and we installed a dure last 50 pvc roof on it 100 x 150 15 000 sq ft.
The original secret fix standing seam metal roofing system the double interlocking ribs and clips ensure strength and watertight integrity.
Snug the screws enough to compress the washer slightly.
Frame up a box the size of the outer dimensions of your deck using 2 by 4 inch lumber.