Take the first flashing piece at roof bottom and slice it at around 4 inches with tin snips.
How to install step flashing with lap siding.
Cement or roof caulk.
Xxdo not install wet siding.
Cover with cap flashing.
Roof side flashing should be folded down over facing boards along roof lines.
Install step flashing with minimum 4 inch 102 mm upper leg.
4 sheathing wraps xxinstall lap siding and vertical siding to structural framing.
Do not extend the siding or trim into the kick out flashing or gutter.
3 flashing xxuse durable non corrosive flashing that is non reactive with fiber cement.
A common problem with cement board siding products and some other types of horizontal lap siding is that older installation guidelines called for caulking the joint instead of flashing the joint.
Xxdo not caulk z flashing at horizontal openings.
Upper leg properly integrate flashing with the secondary water resistive barrier.
Use housewrap flashing tape z flashing or other items as needed to maintain the counterflashing principle.
Install step flashing with minimum 4 in.
Failing to replace step flashings when a cedar shake roof is replaced with a composition shingle roof.
Fasten that shingle with two galvanized.
Xxmaintain 1 4 clearance between the bottom of the fiber cement and horizontal flashing.
Fold the roof side of the.
Properly integrate flashing with the secondary water resistant barrier.
Slice along the bend line about 4 inches into the first piece of flashing at the bottom of the roof with tin snips.
Lift the bottom shingle and slip in the kickout flashing.
This has proven problematic over time as caulking the joint results in unsightly surface appearances due to the different textures as well as.
It is always recommended to install step flashing behind stucco dryvit wood panel lap siding vinyl siding cedar shingle siding etc.
Use housewrap flashing tape z flashing or other items as needed to maintain the counterflashing principle.
How to install step flashing under siding.
Lay a shingle over the step flashing starting at the roof edge.
Xxdo not use uncoated aluminum or metal materials.
Install kick out flashing to direct the water into the gutter.