Vinyl siding installation is designed to hang loosely on the sheathing so that it can expand and contract with temperature changes.
How to install vinyl siding around a deck.
Make the outline large enough to include space for the deck boards on top the ledger and any trim boards on the sides.
How to use flashing between vinyl siding and a wood deck 1.
But if the result is not a whole number you will need to cut the final piece of siding lengthwise in order to fill in.
Then cut away the siding.
Gap at all ends.
Install z flashing along the top edge of the ledger.
The siding slides behind vinyl siding trim pieces that hide the gap and the cut end.
The horizontal leg should be wide enough to extend all the way.
Start by making an outline on the siding where you want to position the ledger board.
Not just another vinyl siding installation video.
To provide a common reference point measure up 8 in.
From the top of this row and stretch a string line across the deck.
Nail undersill trim j channel will also work over the bottom cut using 11 gauge aluminum nails.
If you have to cut the last row of siding you ll.
Begin by installing the first row of siding on both sides of the deck.
For example if the deck has.
If the result is a whole number you re in.
Make the ledger out of pressure treated lumber that is 2 inches wider than the joists.
Vinyl trim and panels cut easily with metal snips a utility knife or a circular saw or miter saw outfitted with a plywood blade installed backward for clean cuts.
This is our most comprehensive.
Divide the length of each wall by 8 inches the width of a piece of siding.
After you install the ledger and decking you ll need to apply vinyl j channel around them to receive the edges of the vinyl siding.