Space the nails 16 inches apart.
How to nail hardie board siding.
Hardie board is pointed out to be popular and endurable in the construction material.
If using a pneumatic nailer choose ring shank stainless steel nails and adjust the depth setting to drive the nails flush with the surface.
1 blind nailing measurements keep nails 3 8 in.
The nail heads should rest snugly against the surface of the boards.
It can be a local hardware store or one of the larger chain stores.
Nails are driven through the sheathing into the studs.
Position a hardie board nail two inches from the bottom corner of the piece and hammer it in place.
Hardie plank siding has a nail line across the top of the board that is 1 down from the top and nails are supposed to fall between and 1 from the top of the board to give the best hold.
Pick out stainless steel or hot dipped galvanized nails size 6d 1 1 2 inch long siding nails and 2 inch long siding nails in the.
Step 3 insert a nail every eight inches around the entire piece.
If hand nailing fiber cement siding use hot dipped galvanized nails and drive the nails into the wall studs.
Nonetheless the cement boards also have both benefits and drawbacks to consider before using it.
Measure down from the top of the installed board 1 1 4 inches every four feet and make a mark.
How to choose nails for hardiplank.
Learn how to nail hardieplank lap siding with this instructional video from james hardie.
How to cut hardie boards in 3 simple ways.
Nails for blind nailing should be between 1 in.
2 3 water resistive barrier finish nail blind nail 3 4 in 1 in.
Go to the nail section in any hardware store.
From ends of boards.
Nail the board to the house every 16 to 24 inches with a roofing nail along the nail line printed on the top of the siding board.
Hammer the nails approximately 3 4 inch to 1 inch up from the bottom edge of the board that is directly above the loose siding.
Hardie board is created by james hardie and it is also known as the cement board.
Leave a space of 3 4 inch on all sides and 2 inches at each corner.
From the top of the board.
It is important that they are not sunk below the surface of the boards so that they create a weather tight seal.