For accurate fastening snap vertical chalk lines on the water resistive barrier at the center of every stud location.
How to properly install hardiplank siding.
The first course of any wall should be installed over a 1 4 lath strip to ensure a consistent plank angle see figure 1.
How to install hardie siding step 1.
Hold a hardieplank siding board with the top edge against the chalk line and 1 8 inch away from the corner trim.
Hardie board siding installation.
Poor siding performance can be the result of improper installation.
To get the longevity you deserve out of your james hardie siding it needs precise installation.
Hardie plank siding is almost always installed with air nailers which are the best tool for quick installation.
Fiber cement is tougher than other materials hold the starter 1 4 in.
Nail the board to the house every 16 to 24 inches with a roofing nail along the nail line printed on the top of the siding board.
How to cut nail and install durable fiber siding plus caulking and painting tips.
The james hardie siding company truly goes the extra mile not only in their manufacturing of durable fiber cement siding but also in its installation.
Blind nail your hardie siding in place.
Apply a 1 1 4 inch starter strip right above the water table trim located at the bottom edge of the house wall.
What are some helpful james hardie lap siding installation tips.
Measure down from the top of the installed board 1 1 4 inches every four feet and make a mark.
When taking planks from the pallet for installation avoid repeating the texture pattern by working your way across.
Installing fiber cement siding fcs such as hardieplank is easier than you might think though there are some important differences from traditional wood siding.
Begin at the lowest point at the side of your house where you will install your hardie siding.
The only downside of pneumatic tools is that sometimes the installer will get going a little bit too quickly and will lose track of where the nails are going.
Optionally install the lap siding with a maximum 1 8 gap and caulk the joint see detail at right.
Install hardiplank siding with joints butted in moderate contact.
Down preassemble the corners install fiber cement using a few special techniques layout the siding courses remove the plastic last flash the butt.