Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
How to put up rolled roofing.
Before you start to fix it you must check its integrity.
For this heat up the gas burner and push it to the edge of the site where it will be fixed.
Make sure the roofing material is laying flat with no bumps or wrinkles attach the upper edge with the large head.
Use 1 nails for re roofing.
The roll is unwound and laid on the site of the future installation.
To seal a plumbing vent spread roofing.
Fix edge fabric roll.
Plan so that no two butt joints are closer than 2 feet from each other.
Use 1 inch nails for new roofing.
How to apply roll roofing laying begins at the lowest point.
How to do it attach first course.
Step 6nail the first course match the overhang to the overhang of the starter strip 1 4 to 3 8 from the drip edge.
Valleys will be open so flash them before hand with metal or two layers of roll roofing the first an 18 inch wide strip and the second 36 inches wide.
They are long enough to penetrate the sheathing.
Do not use the eaves as a guide instead because they can be uneven.
Install roll roofing measure 35 inches up from the eaves at several intervals along the roof and mark them.