Above the bottom of the wall sheathing as a guide.
How to snap lines for cedar siding.
Align one of the vertical edges at the edge of the trim or.
When installing siding great care must be exercised in order that all of the siding lines up at the corners.
I snap the first line as usual after hooking the chalk line on the lowest nail.
Basic maintenance repair and painting of cedar wood siding using gardner flex n fill and behr premium plus exterior paint.
But to snap the next line i just leave the hook in place wind the line over the next nail and pull the chalk box to the correct mark.
Align the thick lower edge of a cedar shake at the lower edge of the siding or shear wall.
Overlap the ends of the flashing 3 inches and seal joints with a paintable synthetic rubber sealant.
It s much faster and easier than resetting the hook each time and the hook never slips.
Snap another line for the bottom row of siding positioning it so it will hang down an additional 1 4 in.
Secure the top edge of the flashing at the studs with 4d nails.
Bend flashing over the water table so it extends 1 inch up the wall.
In addition measurements must be taken every few rows to make sure that the siding matches on all sides.
Place shingles on the guide board and fasten them offsetting joints by at least 1 1 2 inches.
Start at the bottom of the wall at one end.
Snap a line 1 in.
Install these fragile starter strips with a 15 gauge trim gun.
A professional siding installer will use a transit or other leveling device to start all of the siding rows.
Make a similar mark on the opposite corner of the wall then stretch a chalk line between the marks and snap a line.
Should the framing be covered by sheetrock plywood or house wrap before beginning installation snap a chalklike or mark a line over the covering to ensure you nail at least 1 1 4 into the framing each and every time during installation.
Make marks on the other walls at the same height and snap lines on those walls.
When the the lip clears the track on the panel underneath it release pressure.
Attach vertical pieces to a long straight guide and attach to the wall as shown.
Once you have built up the corners by about 10 courses snap a chalk line to mark the bottom of the next course.
Snap vertical chalk lines at each stud location typically every 16 or 24 inches.