Soffit and fascia starting with the soffit nail lengths of j channel against the inner edge of the fascia board.
How to start siding level.
Use the wider starter strip the bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
Installing vinyl siding in these 23 steps step 1.
Measure the height of the piece you need to cut by butting a scrap piece of siding beneath and above the window and marking the necessary height leaving an additional 1 4 inch 0 6 cm of clearance.
It protects the sheathing from rain snow and pests.
Snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house.
The first piece of vinyl you re going to hang is on the starter strip.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
It will be made of aluminum and it usually comes about 3 inches in width and 12 feet long.
Soffit and fascia if the soffit on your home wraps around a corner as with a hip roof you ll need to make some.
Below the top of the foundation but the lower the vinyl siding is installed the better.
Transfer this measurement onto the piece of siding.
It is important to check your level every four or five courses by putting a level on the siding.