Surfaces should be uniform and straight from various viewing angles.
How to start vinyl siding on an angle.
As shown in the diagram a wooden spacer can be used to provide the proper angle for the first strip.
Divide the length of each wall by 8 inches the width of a piece of siding.
Measure the length of the pieces of siding you need at each mark.
Attach matching vinyl j mold to the angled side of the dormer along the roof line and at the top of the siding area.
If you have to cut the last row of siding you ll.
Inspect and plan the job in advance.
On the front side of the dormer install a preformed outside vinyl corner piece from under the eave to the roof line angling the cut in the back for a tight fit.
Install the trim pieces first.
Measure the height of the siding with a measuring tape.
Hold a piece of siding on the wall using.
Longer siding panels don t stretch as readily as smaller ones so they re not as easy to adjust if they get out of whack.
On the wall where you re installing siding transfer the measurement to the wall.
Check surfaces for straightness and fur when necessary.
The procedure used to install soffit depends on the construction of the eave.
To provide a common reference point measure up 8 in.
From the top of this row and stretch a string line across the deck.
For re siding applications nail down any loose panels boards or shingles.
If the result is a whole number you re in.
But if the result is not a whole number you will need to cut the final piece of siding lengthwise in order to fill in.
This should be nailed every 6 inches with it s lower edge running along the chalk line.