Standing at the peak use a garden fork or a specially notched roofing tear off shovel to tear away the ridge caps and the top courses of shingles.
How to strip a roof of asphalt shingles.
Strip off old shingles.
Install the self stick underlayment.
Rig a ladder and your safety equipment that is suitable for your roof.
Strip the roof start at the peak using roofing tear off tools.
To level out an existing asphalt shingle roof rip down reduce the height of two courses of shingles as shown in the drawing below.
Set it up so that loose singles can slide down the roof and into the bin.
Install flashing on any valleys for waterproofing.
If you re not familiar with.
Shingles with sealant on the back surface often have a line or lines to indicate the location on the shingle surface where the nails are to be placed.
Carefully place a ladder near the area of moss growth and don slip resistant shoes old clothes rubber gloves and eye.
Get a shingle ripper or roof shovel to use for removal.
Cover your roof with felt paper and overlap the ridges at the peak.
Nail the shingles with no tabs such as precut pro start shingles and apply asphalt cement from a caulk gun in many dots along the drip edge under the edge then press the tab less shingles down onto the line of asphalt cement dots with adequate spaces between the dots.
Basic steps to replacing a shingle roof.
Get one on amazon.
For most shingles with sealant on the top surface place nails below the sealant strip but above the area that will be visible after the roof is complete.
You don t need any fancy tools to strip roof shingles all you really need is a prybar or shingle ripper also known as a roofing bar and a lot of patience.
Install the drip edge.
Position a construction trash bin beside the building.
Hose off and brush all moss loose from your roof shingles.
Start the tear off at the section farthest from the trash container.
A continuous bead of asphalt could trap condensation or windblown water under the roofing at some point.
How to remove old asphalt shingles before putting on a new roof.
Because asphalt shingles are routinely exposed 5 in rip down the first strip the starter course so that it is 5 in.