Lift the unlocked siding to expose the nailing hem of the siding piece below.
How to work on house siding above a garage.
Transfer this measurement onto the piece of siding.
Start at the bottom and work up overlapping for water tightness.
In my previous job as an r d engineer for a government research lab the geek quotient was way up there.
I ve seen house fires where the vinyl siding burned off only to reveal the superior asbestos shingles underneath which saved the house.
Start your siding at those points doing 3 4 rows at a time and use the level reference line to keep you straight.
The pictured setup is over 20 years old.
The siding must be installed over a flat surface so unless you re siding a new home or have removed the old lap siding you ll need to line the wall with sheets of rigid foam board usually 1 2.
Snap a level chalk line around the bottom of the house about an inch above the bottom of the existing wood siding for a steel starter strip that will hold the bottom of the first row of vinyl.
Keller sons llc roofing siding windows.
Was the problem that they put new siding over old or that they put new siding over a rotted wall with no drainage plain in between.
Install your new siding.
Tongue and groove or other interlocking wood will overlap seams automatically.
If you are using wood or cement fiber nail to studs using a hammer and nails or a nail gun.
They re also a snap to cut and fit in the small spaces around garage doors as well.
Measure the height of the piece you need to cut by butting a scrap piece of siding beneath and above the window and marking the necessary height leaving an additional 1 4 inch 0 6 cm of clearance.
If the job had been done right the house would have been a total loss.
Vinyl siding comes in 12 foot panels with which you can quickly cover large wall areas.
When you did a job at home and came up with an idea you would take pictures and bring them in to sho.
Draw a line on the wall along the top of each siding course before you pull the nails.
In addition to user friendly installation the product provides a maintenance free exterior.
Then slide the tool horizontally along the lock to release it.
In other cases it must come off.
Ok no problem simply still create a level line that is higher than the peak of the garage roof decide where you want the siding to start and measure down from the level line equal distances at the back and front of garage roof.