Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
How to lay apro panel roofing.
Measure the roof with a.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Contact building regulators to determine the requirements for.
The roof panels will not withstand the weight of a person standing at the edge of the panel.
Add the metal panels.
A typical 2000 square foot project costs 22 382.
Installing corrugated roofing 1.
Double embossed 26 gauge galvalume coated steel shingles.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
The application and detail drawings in this manual are strictly for illustration purposes and may not be appli.
Place the first screw.
Do not stand on the roof panel until the panels have been attached.
Take measurements from the roof peak to the eave for custom cut premium pro snap panels.
8 inside closure install along the length of the transition trim about 2 above the bend.
Install the roofing screws vertically along each rib in the panel.
Quantity includes typical waste overage material for repair and local delivery.
Take care the first piece is aligned precisely perpendicular square to the edge.
Panel roofing installation labor basic basic labor to install panel roofing with favorable site.
Pre drill holes on the ridges.
9 roofing panel install with lower edge 1 above the transition bend.
Fasten using panel wood screws.
How to install premium pro snap roofing step 1.
Cut the panels to the desired length.
Pro panel ii install guide.
Panel roof cost non discounted retail pricing for.
The total price for labor and materials per square foot is 11 19 coming in between 9 59 to 12 79.
The national average cost to install panel roofing is 6 13 per square foot with a range between 5 05 to 7 21.
Some panels have pre drilled holes.
Always begin working at the point with the longest peak to eave distance.
Most panels come up to 32 feet 9 8 m in length.
It is extremely important that this panel be laid square to the eave and ridge so that the remaining panels will line up square on the roof frame.
50 yr limited warranty.
Place the leading edge of the first panel along this line.
Use a scaffold for easy access to the roof.
10 panel wood screw space according to the recommended fastening pattern and local codes.
At this point chalk a line from ridge to eave.
If yours do not then you will need to drill holes.